Difference between revisions of "B1-Summary description of the project"

From Iess
Jump to: navigation, search
(→‎Explain how the project can be considered a climate change adaptation project)
 
(11 intermediate revisions by 3 users not shown)
Line 1: Line 1:
−
===(Max. 3 pages; to be completed<sup>[[Talk:{{PAGENAME}}|discuss]]</sup> in English)===
+
===(Max. 2000 char. each; to be completed<sup>[[Talk:{{PAGENAME}}|discuss]]</sup> in English)===
  
−
{{note}}
+
===Can the project be considered to be a climate change adaptation project? ===
−
refer to text in talkpage (to be reworked)
 
  
 +
Yes
  
−
 
+
==Project objectives:==
−
==Project title:==
+
Throughout Europe, there are nearly 243 million people living in places where the population is less than 10,000. This amounts to three times the size of Germany, the biggest country in EU – a substantial proportion of 42% of the whole population of Europe.
−
COWS - Sustainable sewage sludge management by optimisation of co-digestion with municipal solid waste organic fraction
+
For reasons of critical mass, the priority of adaptation to climate change is currently focused on large cities or on major infrastructures. Local communities generally share similar environmental problems even when they are in different territorial contexts. These small communities, and the active involvement of citizens, are a fundamental resource to contribute from the bottom to cope with climate change effects, favouring an improvement of adaptive capacity and overall resilience of the European territory.
−
 
+
The LIFE IESS project aims to design, initiate and demonstrate a bottom-up strategy - aggregating and integrating the resources of partners - to support the development of climate change mitigation and adaptation strategies and action plan al local scale. IESS will ease the management of related climate change policies at a local level, promoting dialogue, understanding and coordination between different stakeholders both to individuate local vulnerabilities of territories and to optimise existing resources. It is devoted to produce the grounding base and feedback for the definition of replicable experience at local communities level increasing the ecological resilience through the promotion of bottom-up initiatives in four areas of action (mobility, land use, energy and water). IESS will create the enabling conditions to facilitate a lasting change in local urban mobility and  engage the public in the benefits of low carbon lifestyle and behaviour. Finally it aims to monitor the implementation of the activities in order to collect feedback to support environmental policy also at top-down level and to establish national and international links with small communities networks to mainstream its approach.
−
==Project objectives and key messages:==
 
−
With a view to breaking the link between growth and waste generation, the European Union has provided itself with a legal framework aimed at the whole waste cycle from generation to disposal, placing the emphasis on recovery and recycling.
 
−
 
 
−
The Waste Framework Directive sets the long-term strategy aims to help Europe become a recycling society that seeks to avoid waste and uses waste as a resource, in accordance with smart and sustainable development targets set by Europa 2020. 
 
−
 
 
−
The Urban Waste Water Treatment Directive, under the Water Framework Directive, and a future Sludge Directive now under discussion, regards producers of sewage sludge.
 
−
 
 
−
Treatment routes and use of sewage sludge is very similar to that of biowaste.
 
−
 
 
−
Waste streams such as sewage sludge (SS) and the organic fraction of municipal solid waste (OFMSW) are underexploited feedstock for bioenergy, withdrawing valuable resources irrevocably from economic and natural cycles.
 
−
 
 
−
Anaerobic codigestion can be considered one of the most promising way to give a proper disposal to the organic fraction of municipal solid waste (OFMSW) coming from source or separate collection systems.
 
−
 
 
−
The two flows of OFMSW and SS may converge into anaerobic co-digestion for the production of biogas.
 
−
 
 
−
In Europe there are more than 35000 facilities that already use anaerobic fermentation for stabilizing sewage sludge. Because of the composition of SS these plants in most case just use the low quantity, low quality biogas obtained for maintaining process heat sending the remaining to flare-torch.
 
−
This is impressive European asset can be upgraded to co-digestion to produce heat and power if there is sufficient quantity and quality of inflow material.
 
−
 
 
−
OFMSW coming from separate collection may secure the required additional supply of biodegradable matter.
 
−
 
 
−
While, municipalities are interested in keeping collection and treatment costs low, biogas plants are only able to treat OFMSW with low plastics contamination.  
 
−
As a result OFMSW is often sent to composting.
 
−
 
 
−
In order to solve this drawback to widespread upgrading of existing SS treatment facilities, COWS project partners Sea Risorse, Sea Ambiente and the Municipality of Viareggio devised an innovative processing solution that implemented at experimental small-scale, achieving positive results.
 
−
 
 
−
That solution is now brought to demonstration scale upgrading the sewage sludge plant of Viareggio to a biogas power-generation facility, diverting 15,000 tonnes/year of OFMSW from composting, and innovating also the business model of cooperation between municipal waste services and water/wastewater services who are producers of sewage sludge.
 
−
 
 
−
The objective of COWS project is to demonstrate how most sewage sludge treatment plant can be upgraded to co-digestion with OFMSW with sustainable outcomes on environmental, social and economic sides.
 
−
 
 
−
The project addresses the Italian national priority (10 a,b,c) in that it contributes to the enforcing of European waste policy and legislation, of waste prevention, and of sustainable use of natural resources.
 
−
 
 
−
COWS project will implement a full scale process upgrade (15.000 ton/year) that will include a prototype pre-treatment unit for high-performance separation of a clean and most useful fraction of OFSMW as slurry to be mixed with sewage sludge and the forwarded to anaerobic digestion.
 
−
 
 
−
Improved digestion performances will avoid sending 1800 ton/year of sludge to composting to be added to 15.000 ton/year of OFMSW, saving 599 TCO2/year from avoided transportation and 853 TCO2/year from power not used for running composting process.
 
−
 
 
−
The biogas obtained exceeds by large the heating and power needs of the plant, allowing a to upload more that 11.000 KWh/day to the grid power, enough ti satisfy the needs of 3.000 people equivalent.
 
  
 
==Actions and means involved:==
 
==Actions and means involved:==
−
 
+
LIFE IEES lasts 4 years and foresees 5 groups of actions. Preparatory actions (A1/A2; 02-09-2013/26-09-2014) are aimed to facilitate the process of participation and bottom-up governance mechanism promoting dialogue and coordination between different actors. The actions will involve actively more than 400 people to support the initiatives  These activities will also produce a first baseline framework assessment through an in depth expert environmental analysis and  highlight potential risks and contingency planning to go smoothly through implementation actions.  
−
COWS will be carried out making use of human, technical and financial resources of the beneficiaries in addition to the requested Community contribution.
+
Implementation actions (B1-B5; 29-09-2014/25-08-2017)  are the core of the project and include a main crossing task  (B1) to produce the grounding base and feedback to prepare the IESS-model handbook and a set of 4 integrated activities on different areas of interest (mobility, land use, energy, water) to design a pro-active bottom-up strategy through micro-projects.
−
Beneficiaries are committed to invest in co-digestion, but Community financial contribution is essential to develop COWS full scale demonstration and innovation characters and to put in place effective dissemination.
+
The C- Monitoring actions (C1/C2; 02-09-2013/02-06-2017) aims at taking track of the reflections on environment and of social and economical impact of the Project.
−
 
+
The D- Communication and dissemination of the project and its results group of actions (D1-D4; 02-09-2013/31-08-2017) are devoted to information activities regarding the project to the general public and stakeholders aimed at disseminating the main results and to facilitate the implementation of the project.
−
COWS implementation will firstly ensure the participation of all stakeholders: citizens and CSOs, utilities interested to apply the same approach, technology providers.
+
The E - Project management actions (E1-E3;02-09-2013/31-08-2017) are devoted to keep full control of project activities and project scope, LIFE+ reporting and accountability obligations. These actions are also devoted to set out how IESS Partnership will to continue disseminating the results of the project over the coming years.  
−
 
+
The consortium is led by the Grantorto Municipality with the support of two other Municipalities: Carmignano di Brenta and Fontaniva. The IESS implementation area are Italy (IT, Veneto Region).
−
COWS plant & process design prepare the essential conditions for implementation of the project, i.e. completion of the final design and obtaining of the necessary permits. COWS design will then be the base of the terms of reference for public procurement of works and supplies.
 
−
 
 
−
Works for modifying current stabilization process will run parallel to the development of the pre-treatment prototype, which will make use of a stable industrial technology that will be adapted for the purpose.
 
−
 
 
−
The modification of the process will affect almost all parts of the plant because flows will change: primary and secondary digesters, pre- and post- thickeners, gasometer and torch, dewatering chamber, power sub-station, de-aeration and treatment plant, finally adding CHP (cogeneration of heat and power) units.
 
−
 
 
−
COWS pre-treatment prototype will be adjusted to obtain optimal particle size and separation of contaminants and non-biodegradable ingredients. 
 
−
 
 
−
The process will then be integrated, adjusted and balanced to optimal performances and finally run on "showcase" mode.
 
−
Showcase mode is intended as running the plant in such a way to facilitate the sharing of knowledge gained during the implementation of the project and allowing interested parties (professionals, utility managers, environmental scholars and activists, CSOs, etc.) to understand better how the COWS approach solved an environmental problem in Viareggio and how to replicate or transfer it.
 
−
 
 
−
After commissioning all parameters will be kept under constant monitoring and made available for evaluation and improvements.
 
−
 
 
−
Documentation of COWS design, model, implementation guidelines, results, will be made freely available.
 
  
 
==Expected results (outputs and quantified achievements):==
 
==Expected results (outputs and quantified achievements):==
 +
Key project results include:
 +
*building of an innovative bottom-up strategy and implementation approach to improve climate resilience at local level (including handbook for small communities)
 +
*demonstration of different micro initiatives to mitigate or adapt to climate change in different field of action (mobility, land use, energy, water)
 +
*an increase in the number of people jointly commuting and hence a *decrease in green-house emission of  225 TCO2/year
 +
*a local carpooling service running with 1,500,000 km/year saved 
 +
*25% increase of use of cycle paths
 +
*25 micro-projects for resilience related to croplands' experimental uses selected and started
 +
*1  “Local Kyoto agreement” in force
 +
*activated energy saving capabilities for 1,000,000 KWh / year
 +
*30 micro-projects for resilience related to water
  
−
COWS will deliver an upgraded SS-OFMSW co-digestion plant processing 15000 ton/year of OFMSW and 62000 m3/year of SS.
+
==Explain how the project can be considered a climate change adaptation project==
−
An essential part of COWS process is a pre-treatment separation subsystem, working on extrusion principle, that allows low cost calibration of optimal cleaning levels of OFMSW inflow and of output slurry properties for best mixing with SS.
+
LIFE IESS is intrinsically a climate change adaptation project, contributing to the Italian national priorities for climate change, and matching its invitation to foster bottom-up approaches. In fact to develop resilience requires that societies grow the capacity to adapt to stresses, including climate variability and extreme events. Two factors necessary for the development of adaptive capacity are the ability to recognize the need for adaptation and to believe that adaptation is possible and desirable.  
−
 
+
Given the uncertainty about future climate conditions, decision makers must now make decisions under conditions of deep uncertainty that make traditional planning approaches obsolete and requires urgently to involve citizens and the grassroots civil society in a pro-active planning. As a project based on a local scale, IESS inherently favours pathways for adaptation.  
−
At full scale operations, COWS will deliver 1000 m3/day of biogas resulting in 13200 KWh/day electric of which 11700 KWh/day sent to the grid, the remaining being used for running the plant.
 
−
 
 
−
Comparing with pre-COWS operations, 400 TOE/year savings and 1452 TCO2/year will be spared to the environment, reducing impact on climate change;
 
−
 
 
−
During the implementation of COWS 5 new temporary jobs will be created.
 
−
 
 
−
By the end of the demonstration run, and as a consequence of it, it is expected that at least another SS treatment plant will start its conversion to COWS-like process.
 
−
 
 
−
==Can the project be considered to be a climate change adaptation project? YES___NO___<sup>[[Talk:{{PAGENAME}}|discuss]]</sup>==
 
−
COWS core action affects directly GHG reduction (1452 TCO2/year), use of resources linked to energy use (400 TOE/year) and efficient use of waste.
 
−
Moreover the cooperation between water and waste services is a strategy that can improve urban systems resilience to adverse events related to climate change (e.g.  stormwater and flood management, long periods of temperatures above average, etc.)
 
−
 
 
  
 +
--[[User:P.santinello|P.santinello]] 18:37, 22 September 2012 (CEST)
  
 
[[index:LIFE|Torna all'indice]]
 
[[index:LIFE|Torna all'indice]]

Latest revision as of 10:53, 23 September 2012

(Max. 2000 char. each; to be completeddiscuss in English)[edit]

Can the project be considered to be a climate change adaptation project?[edit]

Yes

Project objectives:[edit]

Throughout Europe, there are nearly 243 million people living in places where the population is less than 10,000. This amounts to three times the size of Germany, the biggest country in EU – a substantial proportion of 42% of the whole population of Europe. For reasons of critical mass, the priority of adaptation to climate change is currently focused on large cities or on major infrastructures. Local communities generally share similar environmental problems even when they are in different territorial contexts. These small communities, and the active involvement of citizens, are a fundamental resource to contribute from the bottom to cope with climate change effects, favouring an improvement of adaptive capacity and overall resilience of the European territory. The LIFE IESS project aims to design, initiate and demonstrate a bottom-up strategy - aggregating and integrating the resources of partners - to support the development of climate change mitigation and adaptation strategies and action plan al local scale. IESS will ease the management of related climate change policies at a local level, promoting dialogue, understanding and coordination between different stakeholders both to individuate local vulnerabilities of territories and to optimise existing resources. It is devoted to produce the grounding base and feedback for the definition of replicable experience at local communities level increasing the ecological resilience through the promotion of bottom-up initiatives in four areas of action (mobility, land use, energy and water). IESS will create the enabling conditions to facilitate a lasting change in local urban mobility and engage the public in the benefits of low carbon lifestyle and behaviour. Finally it aims to monitor the implementation of the activities in order to collect feedback to support environmental policy also at top-down level and to establish national and international links with small communities networks to mainstream its approach.

Actions and means involved:[edit]

LIFE IEES lasts 4 years and foresees 5 groups of actions. Preparatory actions (A1/A2; 02-09-2013/26-09-2014) are aimed to facilitate the process of participation and bottom-up governance mechanism promoting dialogue and coordination between different actors. The actions will involve actively more than 400 people to support the initiatives These activities will also produce a first baseline framework assessment through an in depth expert environmental analysis and highlight potential risks and contingency planning to go smoothly through implementation actions. Implementation actions (B1-B5; 29-09-2014/25-08-2017) are the core of the project and include a main crossing task (B1) to produce the grounding base and feedback to prepare the IESS-model handbook and a set of 4 integrated activities on different areas of interest (mobility, land use, energy, water) to design a pro-active bottom-up strategy through micro-projects. The C- Monitoring actions (C1/C2; 02-09-2013/02-06-2017) aims at taking track of the reflections on environment and of social and economical impact of the Project. The D- Communication and dissemination of the project and its results group of actions (D1-D4; 02-09-2013/31-08-2017) are devoted to information activities regarding the project to the general public and stakeholders aimed at disseminating the main results and to facilitate the implementation of the project. The E - Project management actions (E1-E3;02-09-2013/31-08-2017) are devoted to keep full control of project activities and project scope, LIFE+ reporting and accountability obligations. These actions are also devoted to set out how IESS Partnership will to continue disseminating the results of the project over the coming years. The consortium is led by the Grantorto Municipality with the support of two other Municipalities: Carmignano di Brenta and Fontaniva. The IESS implementation area are Italy (IT, Veneto Region).

Expected results (outputs and quantified achievements):[edit]

Key project results include:

  • building of an innovative bottom-up strategy and implementation approach to improve climate resilience at local level (including handbook for small communities)
  • demonstration of different micro initiatives to mitigate or adapt to climate change in different field of action (mobility, land use, energy, water)
  • an increase in the number of people jointly commuting and hence a *decrease in green-house emission of 225 TCO2/year
  • a local carpooling service running with 1,500,000 km/year saved
  • 25% increase of use of cycle paths
  • 25 micro-projects for resilience related to croplands' experimental uses selected and started
  • 1 “Local Kyoto agreement” in force
  • activated energy saving capabilities for 1,000,000 KWh / year
  • 30 micro-projects for resilience related to water

Explain how the project can be considered a climate change adaptation project[edit]

LIFE IESS is intrinsically a climate change adaptation project, contributing to the Italian national priorities for climate change, and matching its invitation to foster bottom-up approaches. In fact to develop resilience requires that societies grow the capacity to adapt to stresses, including climate variability and extreme events. Two factors necessary for the development of adaptive capacity are the ability to recognize the need for adaptation and to believe that adaptation is possible and desirable. Given the uncertainty about future climate conditions, decision makers must now make decisions under conditions of deep uncertainty that make traditional planning approaches obsolete and requires urgently to involve citizens and the grassroots civil society in a pro-active planning. As a project based on a local scale, IESS inherently favours pathways for adaptation.

--P.santinello 18:37, 22 September 2012 (CEST)

Torna all'indice