B5 - Water for resilience

From Iess
Jump to: navigation, search


Description and methods employed (what, how, where and when)

What

Water management is a key issue in relation to climate adaptation and resilience.

IESS communities and economies rely on water. The three municipalities are part of the territory of the basin of the River Brenta (Brenta Superior), the important Italian river that runs through the regions of Veneto and Trentino Alto-Adige, characterized by the presence of notable springs. Action B5 should be exemplary for bottom-up approaches. In particular it should demonstrate the hypothesis according to which preventive solutions develop better from top-down but adaptive solutions develop better from bottom-up.

The action has the main objective of identify and launch smart microprojects that allow to affect the optimal use of water in the involved territories, involving the Water for Resilience Interest Group of the IESS Climate Change Commission (CCC-Water).

This action belongs to the B - Implementation set of actions.

How

Action B5 aims to build local capacity to identify and promote smart microprojects for water.

From the methodological point of view, the main result is the creation of a mechanism to link all the interventions related to water to create a local thread of actions. First, this implies knowing what all involved public and private local stakeholders are doing, or are going to do; second, it means taking responsibility and decide together on which are the priorities to focus common main efforts. For example, if there are shared maintenance actions, it will be necessary to be organized in such a way that activities provided by individuals or groups in their properties do not generate lock-in phenomena that prevent possible improvements or future benefits.

The main objective is to ensure that there is a shared way to act informally, linked with the planning but that comes from the bottom and allows the acquisition of a better knowledge of the area in relation to water issues. This attitude can promote a greater awareness, for example during urban planning definition and decisions about spending and investing priorities.

The partners have already identified three main issues in relation to water for resilience.

The first issue is drought (both in relation to the effect on people, on economic activities - agriculture in particular - and on potential changes of ecosystems).

The second regards climate extreme phenomena (especially flooding) that in the case of IESS should be primarily dealt from the point of view of its impact on people and on the organizational capacity and reaction of the community.

The third refers to water quality: namely the need - both in relation to flooding and drought - to ensure a reasonable quality of water, bringing together elements of mitigation and adaptation.

Droughts have links also at local level, which can be linked to the need to adopt virtuous attitudes such as the correct use and consumption of water. In the project's areas there are some "traditions" (like open wells) that should be changed, contributing to cut down the abstraction, hencecontrasting the lowering trend of the aquifer. Other measures foreseen regard volountary attention on water consumption and initiatives to suggest the best behaviour in case of prolonged drought.

Another aspect on which actions can be taken in relation to both drought and flooding, is to facilitate the supply of drinking water. In case of flooding, the availability of drinking water becomes significant, but above all it is important the maintenance of the environment and of the territory. It is fundamental to undertake planning choices that consider the impact of climate change also at a micro level.

For the issue of water quality, basically the idea is to begin to distinguish the various uses and initiate to raise awareness. Starting from the notion of the quality of water for human use, it is possible to focus on and understand also other phenomena (e.g. the effects of nitrogen and phosphorus fertilizers, or that of fertilization with sludge etc.) that may affect and endanger groundwater. In essence, the IESS action on water quality reflects the paradigm that individual choices contribute to raise the attention about macroscopic phenomena that produce a greater impact. For example, a focus on water quality of private wells could be favored, contributing to an overall environmentally aware knowledge of groundwater that comes from first-hand data. In conclusion it comes to take possession of all aspect of water on the territory, from well to the tap, taking into account that in the area of IESS there is a instinctive familiarity with this precious natural element.

The water interest group brings together different views that are not oriented in any way to each other's criticisms. This work is about priorities - with particular attention on micro and small maintenance projects. It is based on common understanding that free choices of individuals are part of a wider community, where interaction should be considered on positive (e.g. Reinforcing) side and negative edge (e.g. lock-in effects). This could objectively reduce the presence of reciprocal vetoes that are sometimes unwanted, but only exist because of ignorance or lack of sharing. The set of shared proposals and projects, along with the process itself, is the main result of the action. The working method will be oriented to gradually build capacity for participation . This group does not replace the work of municipalities but rather becomes part of a participating method.

Meetings will be held (fortnightly or monthly) in which, in relation to the IESS agenda (drought, flood, water quality), participants will examine possible solutions and projects, their connections, and will assess their effectiveness.

The projects that do not necessarily have a cost, as also activities, that fall within the routine maintenance but contribute to a structural improvement are included. The approach should include the identification of initiatives both from public bodies as well as from privates (for example, during the restructuring of private properties).

Projects will be referenced in the IESS Municipalities' Geographic Information System, and thus be visibile and useful to the creation of a local continuity of action on the territories, created simply through linking small but valuable initiatives. Relations with other stakeholders ( for example, with Etra SpA who manages water service in the area, or the Consorzio di bonifica, that has an important role on management of water resources) remains naturally in the background. Discussions and exchange of ideas are certainly necessary at the project level to agree other possible actions at the local level.

Methods employed:

  • best practices selection
  • expert consultations
  • meetings and debates
  • policy dialogue

Where

This action will mainly take place in the project implementation area, i.e. IT.


When

16/03/15-11/08/17


Constraints and assumptions

  • Constraints
    • The selected projects must start inside the IESS project time constraints and be able to produce results before the end of the project
  • Assumptions
    • There is a sufficient number of subjects interested in developing water for resilience projects


Beneficiary responsible for implementation

The beneficiary resposible for implementation is FONTA. GRANT and CARMI participate in the action.

Expected results

Principal results of this actions are

  • 60 public/private micro-projects for resilience related to water individuated and documented
  • 30 micro-projects for resilience related to water started


Indicators of progress

The main indicator is:

  • Performance. For the Performance, specific indicators are among others:
    • nr of micro-projects for resilience related to water presented
    • nr of micro-projects for resilience related to water started


Deliverable products

DB5.1 - Inventory of microprojects for water related mitigation, adaptation and resilience(12/02/16)


Milestones

  • M12 - Inventory of microproject for WR ready (12/02/16)

Timetable

For each project action, please tick the corresponding Period.

B5 - Water for resilience 630 days? 16/03/15-11/08/17


Torna all'indice