B2 - Enable adaptive and mitigating mobility modes
Contents
Description and methods employed (what, how, where and when)
What
Once developed the IESS strategy and the plan in its initial form (B1), the parallel activities of demonstration (B2-B5) can start. It is widely acknowledged that the mobility and transportation sector is responsible for a major contribution to global warming and climate change. Also at local level it now represents a principal matter of concern for planners and policy-makers. In general, the approaches are aimed at the formal, structural elements, with little attention being paid to the users.
In the past there has been a strong opposition by the citizens of the territory involved to the reconfiguration of the provincial mobility system (eg the review of the road axis joining the industrial area of FONTA with the road system in the province of Vicenza) because of the disruptive impact of social relationships and the negative impact on a site of special environmental value as that of the Brenta River. The determination of alternative solutions seems to be based on good starting conditions.
With the IESS Project, the idea is to involve citizens even in the early stages of implementation with the demand for constant feedback. In fact, to build the resilience needed to cope with climate change, the inhabitants must be at the centre of such process. Action B2 aims to create the enabling conditions to facilitate a lasting change in local urban mobility.
The activities are mostly mitigation measures that are oriented through two different directives of local mobility: (1) the circuit of commuting by car (both among participating municipalities and also to surrounding cities) in order to reduce the environmental impact encouraging carpooling services, (2) the integration of existing cycling paths.
How
The first step of implementation is the preparation of tendering to individuate economic operators and award the service of car-pooling in the IESS territory.
The carpooling service will include the design and implementation of a web portal (accessible also through the project website) that enables the composition of the fleets for the movement of people, allowing the sharing of cars between those who follow the same route. In this way, paths characterized by a significant demand for mobility will be selected, concentrating and refining the offer that is not sufficiently satisfied following the reorganization of public transport at provincial and regional level due to budget cuts. The IESS carpooling system would provide immediate benefits such as reducing the number of vehicles, improving traffic congestion, producing savings in terms of cost per capita, improving social relations between people.
The service will be characterized by a minimum technological infrastructure and activated through Web and sms. The CCCs can gather information about available places (stores, bars, cafes, youth centers, both public and private) or subjects (associations or individuals) who want give support for widespread use of the service also towards older people.
Citizens are called upon to give their feedback, during the implementation period, by sending sms, email, messages on carpooling portal pages and the IESS website.
Periodically, during monitoring actions (C1) CCCs and other Commissions on mobility or transportation will verify the information received from citizens and provide feedback for improvement to the service providers. Account of the actual service mileage, mileage savings, lower CO2 footprint will be registered.
We can not exclude that at the time of implementation of the service, the better choice should be the integration with other existing services that could be developed, for example, at the regional level.
The second focus on sustainable mobility is connected to the municipal's cycle lanes investments. Two of the three municipalities involved, FONTA and CARMI have already partially completed existing projects (for FONTA with the construction of 45% of 17.8 km of the total provided bike network; for CARMI with the construction of 35% of a total of 20.2 km). GRANT will start the construction in 2012 (with a prediction of a 15 km lane).
Based on the timing of the works, and in conjunction with the implementation phases of the project, it will be necessary to design a series of cycle lanes connections that allow to complete unconnected paths (i.e. between GRANT and CARMI and between GRANT and FONTA) facilitating this cross-level connectivity between the three municipalities.
The objective is to detailed the planning of the connections that can complement the natural function of the bike paths, favouring other types of use for educational and recreational purposes in order to create a multi-modal system and interrelated pathways for example for local tourism.
For this purpose the creation also of “minor” historical and environmental cycle and pedestrian routes will enhance and protect the natural and rural landscape with particular attention to interactions with environmental values and the anthropogenic impacts.
Where
This action will mainly take place in the project implementation area, i.e. IT
When
16/03/2015-10/03/17
Constraints and assumptions
- Constraints
- Assumptions
Beneficiary responsible for implementation
The beneficiary resposible for implementation is ...........
Expected results
Principal results of this actions are
Indicators of progress
Deliverable products
The deliverable is Dxx - Monitoring and evaluation report about the environmental impact of the project
Milestones
Timetable
For each project action, please tick the corresponding Period.