Detailed technical description of the proposed actions[edit]
It is recommended that each action which is expected to have an important output for the project (e.g. design of the pilot, construction of the pilot, etc.) is presented as a separate action.
The actions must be described as precisely as possible. The descriptions may be accompanied by maps locating the actions, explanatory graphs, tables or pictures which may be included in the forms by using the “Pictures” functionality.
The description of each action should clearly indicate the links with other actions and should clearly (and in quantitative terms) indicate how it contributes to the project's overall objectives. There should be a clear coherence between the technical description of the action and the financial resources allocated.
For each action, the applicant should provide the following information:
- Name of the action: Please ensure that the name is short (maximum 200 characters) and that it clearly reflects the objective of the action.
- Description (what, how, where and when): Please describe the content of the action indicating what will be done, using what means, on which location / site, with what duration and with what deadline.
- Constraints and assumptions: Please indicate what may prevent you from implementing the action as planned and what will be done to address this risk. Please ensure that these constraints and assumptions are in line with those indicated on Form B5.
- Beneficiary responsible for implementation: Please indicate by selecting from drop-down menu which of the project's beneficiaries will be in charge of the implementation of this action. Should more than one beneficiary be implicated, please give full details of which beneficiary is responsible for what in the "Description (what,how, where and when)" section.
- Expected results (quantitative information as far as possible): Please indicate concisely what results will be achieved at the end of the action (e.g. xx ton of waste recycled or yy ton CO2 emissions avoided) and what deliverable products (e.g. guide) will be produced.
- Indicators of progress: Please indicate how progress of this action will be measured.
- Deliverable products: Please list all deliverable products chronologically according to their deadline for completion (day/month/year). Deliverable products are all those tangible products that can be shipped (e.g. management plans, studies and other documents, software, videos, etc). For each deliverable, please include the code of the associated action and the deadline for its completion (day/month/year). Please note that any deliverable product will have to be submitted as a separate document (bearing the LIFE logo) to the Commission together with an activity report.
- Milestones: Please list all project milestones chronologically according to their deadline for delivery / achievement (day/month/year). Project milestones are defined as key moments during the implementation of the project e.g. ”Nomination of the Project Manager”, "Initial operation of prototype", “Final conference”, etc.
Milestones (or corresponding documents) do not need to be submitted to the Commission. In a report, you would need to inform the Commission whether the milestone has been completed or not.
- Timetable: For each project action, please tick the corresponding Period. When planning the implementation period of your project, please bear in mind that a LIFE+ 2012 project cannot start before 01/07/2013. Also, please add an appropriate safety margin at the end of the project to allow for the inevitable unforeseen delays.